Terrain Fuze gravity drainage pipe with electrofusion joint

Side view of a pipe showing the joints. Side view of a pipe showing the circular section. Side view of a pipe showing the circular section. Side view of a pipe showing the circular section. Side view of a pipe showing the joint.
Side view of a pipe showing the joints. Side view of a pipe showing the circular section. Side view of a pipe showing the circular section. Side view of a pipe showing the circular section. Side view of a pipe showing the joint.

Description

An example of drainage pipe for soil and waste management with an electrofusion joint. It is made from HDPE, selected because of its strength, adaptability, and durability, and because it allows electrofusion coupling, hence its title 'Fuze' which produces permanently leak proof joints and can therefore be used in spaces to which there is no future access or where access is challenging. This kind of drainage system was used widely at the Olympic Park, London 2012.
Designers & Manufacturers
Designer (Person)
Manufacturer

Inscriptions

moulded: "906-019-12"

Object number

AIBDC : 006532.2

Date

2012

Country

Dimensions
Width
230mm
Height
235mm
Diameter
121mm

Colour